- Location Setúbal
- Construction Period 2015
- Product ranges used Isodur
About Setúbal Hotel & Tourism School
		The restoration works were highly complex due to the amount of rising damp on the walls caused by a high water table, therefore it was essential to increase the thermal insulation that was required.
 
         
                         
                         
                         
                         
                         
                         
                         
                             
                             
                            