Buildings
New construction

Municipal Stadium of Braga

The dialogue between architecture and engineering: the stadium structure project, characterised by the innovative technical solutions that were developed, the technology used for the tests and roofing, and the meticulous planning of the implementation of the construction works.
  • Location Braga
  • Construction Period 2002-2003
  • Client Braga City Council
  • Engineering Project Eng. Rui Furtado
  • Architecture Project Arch. Eduardo Souto de Moura
  • Concrete Volume 100 000 m³
  • Recognition Secil Architecture Award 2004 and Secil Civil Engineering Award 2005
About the Municipal Stadium of Braga

Souto de Moura developed a project without stands at the top, because he believes that one should watch a football match like on TV or at the cinema.

The result should be simple in its shape and in its construction logic. The works are the culmination of an intense, demanding and stimulating dialogue between architecture and engineering.